I-235百老汇延伸走廊拓宽和I-44交汇处

俄克拉荷马县,俄克拉荷马

一个复杂且交通堵塞的立交不得不被取代.

At what once was the crossroads of 达拉斯-to-Kansas City trail drives and the Chicago-to-Los Angeles trade route, 两条州际公路, I-44和I-235, 现在相交. Increasing transcontinental traffic on the I-44 corridor and a heavily traveled north-south railway created the need for a critical and challenging update to the interchange. 班, 哈斯克尔公司, 是因其团队对交换的大局观而被选中的, 对施工交通控制的深刻关注, strong bridge design staff and innovative solutions to minimize disruption to the traveling public.

我们在这个前所未有的项目中引入了突破性的技术.

The project was divided into five construction contracts with a total estimated cost of $220 million, the largest project cost in the Oklahoma Department of 运输 (ODOT) history at the time. 该项目的两个阶段是该州历史上重要的第一次. One was the first four-level highway interchange on the ODOT highway system. 另一个是架设两个铁路桁架, each measuring 275 yards long and 45 feet high and weighing 2 million pounds, 为BNSF铁路提供一条主干线. 班 crafted project documents that instructed the contractor to use Accelerated Bridge 建设 (ABC) techniques, performing truss member assembly 1/4 mile north of the final location and using Self-Propelled Modular Transports (SPMTs) to move the trusses into position.

规划 and innovation allowed minimal disturbance and early completion.

班’s innovating planning allowed the bridge move-in to occur with the highway’s full closure over a two-and-a-half-day weekend. 高速公路停车是为了让列车畅通无阻, 然而,工作几乎比计划提前了整整一天结束, 在周一早高峰时间之前. 进一步, retaining walls of up to 30 feet in height were designed using adjoining drilled shafts in a “tangent pile” configuration to retain existing embankments. This innovative construction technique allowed the project to proceed without relocating the adjoining businesses or interfering with the railroad embankment. 最终, with careful planning by ODOT and 班 and skillful execution by the contractor, the project was completed nearly a year ahead of the original schedule.

  • 多级州际互通
  • 三个与当地街道的交汇处
  • 十六岁的桥梁
  • 铁路桁架桥
  • 三个编织斜坡桥
  • 挡土墙
  • 五个建设项目
  • 施工顺序
  • 智能交通系统(ITS)
  • 用于交通监控的闭路电视摄像机
  • 立交照明设计
  • 签署
  • 路面标线
  • 交通信号作用
  • 多个施工阶段
  • 液压
  • 立交桥和坡道
  • 交通研究
  • 交通管理计划
  • 效用搬迁
  • 街景画
  • 铁路桁架桥梁设计
  • 自助式模块化运输(SPMT)桁架搬进
  • Drilled Shaft 挡土墙 constructed without disturbing active rail traffic in close proximity American Association of State Highway Officials (AASHTO) standards
  • 公众参与
  • Grand Conceptor Award from American Council of 工程 Companies (ACEC) – Oklahoma Chapter
  • Gold Award (项目 Completed in 2019 Divided Highways Urban Category) from the American Concrete Pavement Association (APWA) – Oklahoma Chapter
  • Project of the Year Award (运输 More Than $75 Million Category) from American Public Works Association (APWA) – Oklahoma Chapter
  • Best Project Award (项目 Completed in 2018 Highway/Bridge Category) from the 工程 新闻 Record – Texas & 路易斯安那州地区
  • American Railway 工程 and Maintenance-of-Way Association (AREMA) components

相关项目

创新思维不仅被鼓励,而且被要求. 班 worked with us hand-in-hand to provide innovative solutions to the challenge."

布莱恩•泰勒
俄克拉何马州交通部总工程师
钢质铁路桥梁桁架安装前

创新思维不仅被鼓励,而且被要求. 班 worked with us hand-in-hand to provide innovative solutions to the challenge."

布莱恩•泰勒
俄克拉何马州交通部总工程师
Aerial view of I-235 Broadway Extension Corridor project adjacent to Central Business District

相关新闻 & 的见解

隐私政策

我们的网站使用技术为您提供个性化的体验. 根据我们的隐私政策,我们需要您同意使用cookies. 点击“接受”,即表示您同意我们使用cookies.